Tile and finished surfaces first
Frameless glass is measured to the finished opening. Tile, stone, curb caps, benches, and knee walls should be complete before final measurement.
Measurement Guide
A shower is usually ready for final glass measurement after tile, curb, walls, bench tops, and finished surfaces are complete.
Measurement Guide
A shower is usually ready for final glass measurement after tile, curb, walls, bench tops, and finished surfaces are complete.
Frameless glass is measured to the finished opening. Tile, stone, curb caps, benches, and knee walls should be complete before final measurement.
Check that walls are finished, the curb is set, plumbing trim is known, and any niches or benches that affect panel layout are complete.
Measuring before surfaces are finished can lead to gaps, clearance issues, or ordering glass that does not match the final opening.
Next Step
Photos, city, rough size, and tile status are enough to start the conversation.
Related Pages
Short guides and service pages for the same kind of project.
FAQ
Planning can start earlier, but final measurement should happen after finished surfaces are ready.
Send wide photos of the full opening plus close photos of walls, curb, bench, controls, and tight clearances.
Next step
Send photos, plans, or measurements and we'll help with the next step.